Industrial Process Management Model to Improve Productivity and Reduce Waste

[ad_1]

1. Introduction

During the last decades, important advances have been made in the development of methodologies that improve the productivity of production processes. These advances have focused on the prediction, reduction, or elimination of sources that generate interruptions or waste in processes, guided mainly by Lean methodologies, statistical control systems, and standardization standards [1].
Currently, the question arises about the impact that the implementation of industry 4.0 technologies will have on maintaining productivity growth rates, and to what extent they will be linked to the capacity of human–machine systems. The changes are evident in the way human work is carried out and organized [2], how to react quickly to special situations, or anomalous patterns that arise in production processes will depend largely on the human factor, which requires constant control, direction, and coordination to achieve optimal results.
Ref. [3] states that conventional production control methods are inefficient and incapable of responding to systems with frequent interruptions, so developing multi-agent systems capable of coordinating tasks between peers becomes imperative, aging of workers, ergonomics in equipment design, risk minimization, and labor laws are challenges that are increasingly worrying industrialized countries [4]. Ref. [5] indicates that Industry 5.0 reaffirms the unmet objectives of industry 4.0 and puts humans at the center of smart manufacturing systems (SMS) where machines and humans can generate knowledge and learn from each other, creating a virtuous co-evolution, so human–machine interaction must be deeply understood to create effective collaboration between people and SMS.
Multiple scientific articles declare that humans in future production and logistics systems will not always see their active role reduced but will collaborate and make important decisions based on the information that new technologies make available to them [6]. Human–system interactions are relevant in decision-making processes of industrial maintenance departments. This interaction is affected by four factors: confidence in the predictive model, control in the decision-making process, availability of cognitive resources, and sufficient and adequate organization in the decision-making process [7].
Imai M. (2012) [8] identified divergences in the way management can engage with the production process (Gemba). According to his propositions, management can either direct to control the Gemba or adopt an approach of listening, learning, and support. Additionally, the possibility for the operational area to adjust action plans or methods fosters the kaizen philosophy.

Our objective is to generate a model that results in a continuous improvement system tailored to a company, under the conditions of new data availability technologies (Big Data) and modern communication technologies, enabling real-time, holistic connections between the Gemba and management, promoting sustainability.

Our model innovates by combining the improvement cycles of kaizen and lean philosophies, real-time adjustment of action plans, concepts from the PID model, and the situational awareness model.

The developed model emerged from practice, being simple and integrable to Lean, control and standardization methodologies. As a result of its implementation, it was possible to achieve significant improvements in productivity and a digital record of situations that complements big data, in a relatively short implementation time and without large investments. Additionally, allowing the permanent establishment of group communication channels that strategically link individuals, raised situational awareness at higher levels of the organization and allowed more agile decision-making during interruptions.

In this publication we complement preventive efforts with an efficient corrective approach, which will define how to handle production interruption situations, in order to minimize their impacts and maximize the resilience of the production system as a whole.

Avoiding and preventing interruptions in a production process or a supply chain has been the focus of recent years, with little attention paid to fault management and the consequences of these situations after they have occurred [9], focusing mainly on identifying its origin and in taking measures to prevent its occurrence, with multiple methodologies for preventing and predicting risk situations [10].
Ref. [11] identified that interruptions to a supply process can generate adverse consequences, such as the bullwhip effect. However, they also observed that fluid and effective communication between the participants in the process can reduce these negative effects.
Endsley M. [12] described situational awareness as a continuous process, composed of three essential levels: perception, comprehension, and projection of the situation. These levels are essential so that individuals can adapt to changes in their environment, make effective decisions and achieve their goals. At the level of perception, we find the fundamental basis of situational awareness and refer to the ability to perceive and capture relevant elements and events in the environment. The level of comprehension involves the interpretation and analysis of the information perceived at the previous level and seeks to understand the situation in its entirety, establishing connections between the different elements. Finally, at the projective level it seeks to project future and anticipate changes, making decisions based on available information and considering possible future scenarios. Ref. [13] describes how situational awareness models can be adapted for a specific context and how information from multiple sources can be integrated to improve decision-making accuracy.
Endsley M. [14] stated that situational awareness models enable decision making and support systems to collect, analyze, and present relevant information in real time, to support timely and accurate decisions.
The technological tools of industry 4.0, with their perception, comprehension and projection capabilities in real time, are proving to be powerful but challenging tools for operators, who still feel distrustful of the systems, especially people with greater experience in processes [7].
The situational awareness model has had various areas of application, such as construction [15], medical services [16], aviation security [17], port security [18], security of the internet of things [19], disaster management [20], and sports [21].
Ref. [22] used the Fuzzy DEMATEL method to investigate the interactions between key variables affecting situational awareness. The results of the study prioritized the variables that most influence situational awareness, including “Communication and coordination between teams”, “Staff experience”, “Support equipment and tools”, “Staff cognitive ability”, “Staff strategies and policies”, “the organization”, “Staff training and education”, “Information and communication technology”, and “Sources of information”, concluding that the organizational variables and some individual variables were the critical factors that affected the level of situational awareness of the workers who were injured in the industrial processes investigated.
The distrust detected by [7] in production systems that have implemented 4.0 technologies, and the variables that affect the levels of situational awareness explained by [22], support the suggestion of [23], who suggests that greater collaboration and communication between workers on different shifts, and promoting a culture of learning and development, can be beneficial for knowledge transfer and learning in manufacturing and other rotating shift work environments.
Ensley M. [24] indicates that, in the future, semi-automatic security systems will prevail as hybrid teams between humans and AI, overcoming their limitations of perception, biases due to limited training, limitations regarding the projection of developing situations, and fragilities in the identification of new situations.
Information flows among humans have been modeled by various authors; these models were summarized by Mcquail D. [25].

The information flows in the processes are varied and, together, constitute what we know as big data. Although industry 4.0 has generated a considerable volume of information, allowing artificial intelligence to access and detect useful patterns of comprehension and predict failures or deviations in processes, since communication between human beings cannot always be controlled, especially when it is not possible and there is an explicit digitization of all information flows. This is even more complex in situations of implicit communication or in learning flows between apprentice and master, which are all subject to legal regulations that protect the privacy of workers.

The explicit part of human communication has occurred through various technologies; the experience of Konak A. and Kulturel-Konak S. [26] indicated that in teamwork, the main tools are email, instant messaging, video conferencing, online document sharing, and online project management systems.
Although, we can also say that the following applications with their respective creation date are widely used for teamwork: JiraMT (2002), SkypeMT (2003), BasecampMT (2004), ConfluenceMT (2004), AsanaMT (2008), WhatsAppMT (2009), TrelloMT (2011), MiroMT (2011), ZoomMT (2011), Monday.comMT (2012), AirtableMT (2012), FigmaMT (2012), SlackMT (2013), NotionMT (2016), ClickUpMT (2017), Microsoft TeamsMT (2017), and Google MeetMT (2017), just to name the most relevant.
Ref. [27] carried out a study to evaluate the choice and effectiveness of the media in the resource-request process, detecting that during the choice process there are social costs (such as the fear of being scolded or not attended to) that affect the choice, concluding that the efficiency of face-to-face communication is superior to that carried out using email as a means of communication. Related to this, some claim that face-to-face meetings are not effective and even harmful to productivity, taking away factory supervisor’s valuable time. Refs. [28,29], and others argue that the way a meeting is organized is important, especially videoconferences, where it is recommended that they be brief and with few people [30].
During the COVID-19 pandemic, Ref. [31] successfully employed the WhatsAppMT (version 23.12.76) tool as a communication channel in a hospital environment. On the other hand, Ref. [32] showed the effectiveness of WhatsAppMT as a communication tool between teachers and students. Likewise, Ref. [33] suggests that the use of WhatsAppMT could be a valuable resource to drive innovation in the work environment, as long as it is managed appropriately in consideration of the stressors and workload of employees.
Information flows are not always formal. Ref. [34] examined the role of shadow IT in knowledge management of the manufacturing processes. The authors used a multiple case study approach to investigate how employees in different organizations use unauthorized IT tools (such as WhatsAppMT) to manage and share information. The findings revealed that shadow IT tools can be an effective way to improve knowledge management, but also presents security risks and integration challenges with authorized IT tools. The authors conclude that organizations must adopt a balanced approach that allows the use of shadow IT in a controlled and secure manner to improve knowledge management.

How we control industrial processes is a question that has occupied us since the beginning of the industry. The PID (Proportional, Integral and Derivative) control model, conceived by the contributions of James Clerk Maxwell, Nicolas Minorsky and Edson Briggs in the 19th century and the beginning of the 20th century, allows for the regulation and stabilization of industrial systems effectively, being fundamental in the automation of industrial processes.

A PID control system can control one or multiple variables, but there may be the case in which the variables are combined in a new way, or a new qualitative variable or external event appears that generates a new scenario. Ref. [35] defined a situational pattern as an abstraction that represents a recurring scenario that can be found in a variety of situations or contexts in a process. That is, a situational pattern is a way to capture an experience in a process and use it to solve recurring problems more effectively. It is important to highlight that we will find new patterns in a process that are invisible to artificial or human intelligence and that only after observing their consequences will we have any possibility of identifying them.
We must not forget operations management as a catalyst for improving productivity. Ref. [36] studied the importance of the synergy between lean methodologies and a coordination model to improve efficiency in processes where they declare that simply automating a process without previously improving it does not guarantee its efficiency, which is why it is necessary to apply continuous improvement methodologies such as lean to identify improvement opportunities and then implement them effectively. They also discuss the importance of an organizational culture focused on continuous improvement. The communication within organizations must be designed openly, broadly, symmetrically, and multidirectionally [37].
We did not find publications that specifically address operations management detailing the three hierarchical levels as presented in our model. Reference [38], in its bibliometric study of the year 2023, indicated that there are few investigations that deal with social relationships in the production planning and control process, in addition to their implications in the decision-making process.

2. Materials and Methods

2.1. Description of the Proposed Model

Our model requires the selection of key areas of the manufacturing process, which will be responsible for perceiving and transmitting situations or events in real time. The selection of these key areas depends on each case in which it is implemented and are mainly defined, considering the sources that generate interruptions in the process and work teams already trained in the operation.

The communication tool or technology that will be used as a medium must be selected based on management requirements, allowing at least a flow of information, recording of operation situations, and fluid communication between participants.

The proposed group situational awareness model for industrial process management (see Table 1) is a combination of Endsley M.’s situational awareness approach [12] and the PID (Proportional, Integral, and Derivative) control model. The situational awareness model provides a framework for the comprehension of how people perceive, comprehend, and project a situation in an operational environment, while the PID control model is a control algorithm used to continuously adjust a process variable based on deviations measures.

This new model of group situational awareness focuses on effective collaboration and communication between team members with the goal of managing manufacturing operations efficiently. By combining situational awareness with PID control, the aim is to improve coordination and decision making in the environment of an industrial process. This joint approach offers benefits such as greater awareness of the current and future situation, more informed decision making, precise control of process variables, and improved efficiency and productivity in manufacturing operations. This model could find applications in various industries, such as logistics, manufacturing, and health services.

Figure 1 shows a diagram that represents the operation of the model. Initially, events, which are occurrences, incidents, data, or trends of control variables, act as signals that are perceived by the process participants. This stage is called primary perception. One or more participants who are part of the coordination groups then encode these events as messages and transmit them in real time using communication technology. These messages are expected to be structured in a predefined way.

At this point, the coordination group is in a specific situation, known to all participants in that particular group. However, there are participants who are part of more than one group, whom we will call transversal participants. These transversal participants have a higher level of perception, which we will call secondary perception, since it is based on the perception of multiple groups. Cross-cutting participants are responsible for perceiving situations between different groups and creating situational patterns or scenarios.

These patterns or scenarios may be difficult to perceive by participants in primary operational areas.

Primary and secondary perception and the detection of situational patterns are fundamental for the comprehension stage, which involves both individual and group cognitive work. This cognitive process depends on the skills, experience, and talents of the participants involved. During this stage, comprehension can be expressed explicitly through a message shared by one of the participants in the communication group. There is also the possibility of implicit comprehending, in which group participants are assumed to have complete knowledge of the situation or scenario, even if it is not explicitly discussed.

Explicit comprehension triggers an incremental process where participants share their opinions regarding the situation. This interaction is affected by factors such as the degree of influence of the participants, experience, and knowledge.

Although comprehension is not a projection of future situations, it delivers as a product a diagnosis that determines the actions to follow.

Before defining an action plan, it is crucial to carry out a careful evaluation to determine if the situation in question is known and if there is a previously established action plan, or if it is a special circumstance that has not yet been addressed by the team and requires an additional analysis.

In the second diagram (Figure 2), the model adjusted to the management of industrial processes is presented, allowing the functions of the operational, tactical, and strategic levels to be visualized in the activities of perception, comprehension, projection, decision, and action of the group situational awareness model. Each stage is described below:
  • Perception at the operational level: begins with the real-time capture of the state of the process and environment variables. In this stage, similar to an analog–digital converter (ADC) that converts an analog signal into a digital interpretation, the participants of the coordination system perceive the state of the variables or their rate of change and transform it in a message. This allows information to be shared in real time, improving both individual and group awareness. Furthermore, cross-sectional participants carry out secondary perception by perceiving the status of different groups. This secondary perception becomes the output of this stage.

  • Perception at the tactical level: The participants of the communication groups that belong to the tactical–functional departments are generally transversal participants and their main contribution is to influence the comprehension of the state of the system with their opinions.

  • Perception at a strategic level: The directors in charge of generating strategy are responsible for perceiving the external and internal events of the company, for this they must build constant monitoring and follow-up systems, which aim to maximize internal and external situational perception.

  • Comprehension at an operational level: Begins with the creation or clear identification of a situation or situational pattern. This information feeds a situational statistic and then advances to a stage in which the established guidelines are consulted to proceed in common or special situations or patterns. Quick identification of a situation or pattern is crucial to ensure prompt implementation of the action plan. However, special situations require a thorough review by the tactical area, since tactical action plans must adjust to the manufacturing strategy.

  • Comprehension at the tactical level: Implies a high degree of situational awareness, since at this level information from both the operational and strategic levels are integrated. This allows for a complete comprehension of the situation and, therefore, the responsibility for managing and creating situational statistics falls at this level.

  • Comprehension at a strategic level: It involves analyzing the competitive position, identifying opportunities and challenges, and establishing a strategic direction. The perception of relevant information, the visualization of situational patterns and multi-criteria evaluations are key elements in this level of comprehension. Furthermore, the importance of carefully reviewing special situations to evaluate their impact on the different strategic perspectives is highlighted.

  • Projection at a strategic level: It is a key stage for the future of the company, which is based on the perception and comprehension of the environment and interior of the company; subject to the objectives and strategic plans, the projection defines the company’s path to follow.

  • Projection at the tactical level: After comprehension, the adjustments made by management to the objectives and strategic plans, the tactical area projects the use of productive factors subject to capacity restrictions, the planning of new situations is often only an estimated value and is awaiting the results of the implementation.

  • Projection at the operational level: Once the operational area has understood the action plans adjusted by the tactical area, it proceeds to make a projection of the implementation of said plans. This projection involves simulating how current resources will execute new methods, product modifications, the use of new tools, or changes in working conditions. In common situations, this projection is known, and the results are estimated with high precision, which allows an immediate response; in special or new situations, you must wait for execution to see results.

  • Decisions at a strategic level: Corresponds to the decisions to adjust the objectives and strategic action plans contained in the company’s strategic map. On some occasions, change programs are generated that require modifications in capacity, productivity, quality, technology, and cultural.

  • Decision at a tactical level: Corresponds to the decisions to adjust the strategic requirement. In the face of a special or new situation, these adjustments are related to the requirements of productivity, quality, design, and technology.

  • Decision at the operational level: Corresponds to the decisions to adjust the tactical requirement. In the face of a special or new situation, these adjustments are mainly related to the standard method and times.

  • Action at the operational level: It is the application of methods, talent, and technology in the operation. This implementation is aligned with the tactical and strategic levels and is in tune with the organizational culture.

2.2. Model Implementation Methodology

2.2.1. Stages for the Implementation of the Group Situational Awareness Model for the Management of Industrial Processes (See Table 2)

For the implementation of the proposed model, a sequence consisting of eight stages was first developed, and then with an action researcher approach developed by Coghlan P., Coghlan, D. in 2002 [39], each of the stages was implemented in a real production process.

Table 2.
Stages of implementation of the group situational awareness model in the industrial process management.

Table 2.
Stages of implementation of the group situational awareness model in the industrial process management.

Implementation Stages Aim
1.

Carry out an audit of the manufacturing processes and communication among humans.

Identify the current state of manufacturing and communication processes.
2.

Establish with management: scope, deadlines, objectives, goals and restrictions of the productivity improvement project.

Achieve a commitment between the company management and the productivity improvement project, using improved communication processes.
3.

Select the technology to use in communication processes.

Incorporate a tool that meets management requirements and efficient group communication in real time.
4.

Define communication groups.

Identify the main sources of interruptions in the operation and the company’s organizational chart, based on this define the communication groups.
5.

Define the people who will participate in each group.

Establish the suitable people who will participate in the project.
6.

Conduct training for the correct use of the communication and resource delivery tool.

Train, engage and motivate participants in the use of the selected communication tool, establish communication rules, transmit productivity improvement objectives and deliver resources.
7.

Establish project evaluation cycles with communication groups and carry out reviews.

– Define the frequency of review of the communication system.
– Review of What? How? Who? And when? issue messages through the communication channel.
– Analysis of situations that seek to increase the perception, comprehension and projection capabilities of the participants.
– Define and review corrective, preventive actions and improvement options in communication activities.
8.

Establish the evaluation cycles of the improvement project with management.

– Define the frequency of review of the communication system.
– Presentation of results regarding the goal.
– Analysis of special situational patterns.
– Evaluate strategic actions.

2.2.2. Description of the Implementation Stages

  • Identify elements (products, equipment, people, facilities, services, software, etc.), variables (qualitative and quantitative), situations, and scenarios to be analyzed with management according to the guidelines established by Platts K. and Gregory M. in 1990 [40].
  • A series of meetings is established with management, based on the information obtained in the audit and historical statistics, defining the scope, objectives, goals, deadlines, resources, technology, and restrictions of the productivity improvement project, Which will have as its main tool an improvement in communication processes using technology.

  • The technology must be selected considering management requirements in terms of budget, information security, access, and features for efficient communication. This definition must be agreed upon with management.

  • Based on the statistical information, the organization chart, the information generated by the audit, and the researcher’s criteria in action, the groups must be defined. In our case, the model pre-establishes the quality, maintenance, and supervision groups, but they can establish groups such as human resources, logistics, purchasing, sales, etc. depending on the specific case.

  • Before deciding who will participate in the groups, it is important to carry out an evaluation of the human resource that helps us determine if it has any incompatibility with the project. After this, a meeting must be held with the operations management to define who will participate in the groups.

  • The objectives, goals, and deadlines for the implementation of the productivity improvement project must be transmitted to the staff, improving coordination with a communication tool in the processes. Communication norms must be established and taught to participants, establishing schedules, type of information to be transmitted, language to be used, confidentiality rules, etc.

  • The action researcher, together with the head of operations, must coordinate periodic instances of physical or remote meetings with the participants of each group, where the functioning of the coordination system and its relationship with the objectives of the productivity improvement action plan must be reviewed. In these meetings, the statistics of the previous cycle or period will be presented, the progress made regarding the goals. and the individual situations of each group will be analyzed where they will be shared with the participants of other groups to increase their level of group situational awareness.

  • The action researcher together with the operations manager must coordinate physical or remote meeting instances with management, where situational statistics, special situational patterns, performance regarding goals will be reviewed, and strategic actions will be evaluated.

2.3. Application of the Model in a Real Case

The application of the model was carried out during the implementation stage of the prioritized strategic action plans according to the work carried out by Quezada L. in 2022 [41], in a company in Chile.
Stage 1. An audit of the manufacturing process is carried out and it is observed that the largest gaps are in the following factors: equipment performance, communication technology, planning and control, and skills and training (see Figure 3).

Stage 2. After observing the decision making of the operational and tactical levels, the action researcher proceeded to participate in a series of meetings with management, from where the level of awareness of the management situation could be perceived and comprehended, and thus project the company’s strategic objectives and plans.

The objectives and goals defined by management for the productivity improvement project were:

The restrictions were: not to make large investments and to minimize layoffs.

The scope of the improvement plan was defined as the manufacturing operations area, including the quality, maintenance, planning, and operations supervision departments.

In addition to the above, and before being able to intervene in operations at an operational level, management requested a series of implementations that aimed to collaborate with tactical management:

  • Redesign of production programs;

  • Identification of factors that affected the productivity of the process;

  • Establish planning rules;

  • Implement a planning module that is integrated into the company’s ERP;

  • Implement a production and inventory control module;

  • Implement the quality management and production control department.

Once the actions that strengthen the tactical level of operations have been implemented, the Action Researcher assumes the role of Production Manager and begins with the interventions. This is performed with a permanent presence in field operations, observing problems and situations in real time, comprehending how operators, supervisors, area managers, and planners decided in situations and scenarios that emerged during the operation. The period defined by management to achieve the goals was 9 months.

Stage 3. In the technology selection stage, we found various applications available, but without many inconveniences it was agreed with management to use WhatsAppMT as the communication tool for the productivity improvement project; this mainly due to its popularity, low barriers to entry, stability of operation and the multiple possibilities of issuing a message.

Stage 4. Coordination groups were established based on:

As a result, and after a review with operations management, the following communication groups were defined:

  • Quality;

  • Maintenance;

  • Supervision.

Stage 5. The decision of those who participated in each group was based on the following criteria:

  • The number of participants in each group should not be too high to facilitate agile decision-making, but not so small to avoid biased decisions;

  • Participants in each group must have technical knowledge, connection to the process in question, availability, and commitment.

The groups were made up of 19 people in maintenance, 15 in quality and 12 in supervision. It is important to highlight that the number of people aware and connected to the communication system depends on the company’s policies, in this case only if it is within the people’s work schedule (see Table 3).

Stage 6. Three initial meetings were held which had the following objectives:

  • Transmit to the participants the objectives, goals, and deadlines of the productivity improvement project, bridging the most significant gaps and using communication as a fundamental tool.

  • The head of operations, the person in charge of occupational risk prevention, and the action researcher established the basic aspects to regulate:

    • Hours of use;

    • Safe places for review and issuance of information;

    • Way (text message, audio, video or file) to issue a message depending on the situation;

    • Content and length of messages;

    • Confidentiality;

    • Recommended formats for emergency communications, coordination, suggestions and changes.

  • In this third meeting, the follow-up and monitoring indicators were defined, the resources (cell phones) were delivered and the communication system using mobile technology was started.

Stage 7. Meetings with project participants were established on a monthly basis, and the work plan was based on compliance with the PDCA cycle (plan, do, check, act), which was repeated during the project. The activities at each stage of the cycle were:

  • Plan: The production manager (action researcher) assumed responsibility for this stage, establishing objectives, goals, metrics, those responsible, and the execution schedule of the action plans for each cycle.

  • Do: This a stage of responsibility distributed among the participants, which seeks the rapid implementation of the defined action plans when specific situations arise.

  • Verify: The production control area must generate situational statistics and analyze the existence of situational patterns, generating a relationship with the metrics and objectives of the improvement project, evaluating the strengths and weaknesses in communication via WhatsAppMT.

  • Act: This is a stage of responsibility distributed among the participants. The aim is to make adjustments or modifications to the communication standards and implement the necessary changes or adjustments in the process.

This cycle is repeated monthly, allowing continuous monitoring of the improvement process, adjusting the plan based on the results obtained.

Stage 8. The action researcher and the operations manager scheduled monthly meetings with management, where situational statistics, special situational patterns, and performance regarding goals, objectives, and strategic action plans were reviewed in each instance, considering the company’s external and internal environment.

4. Discussion

  • Stage one: The audit process guided by Platts K.’s guidelines [42] helped us identify the gaps of the main factors that affect productivity and the action plan prioritization methodology designed by Quezada L. [41] allowed us to sequence and focus resources.
  • Stage two: The process of analyzing the gaps and their statistics with management was delicate, since numerous complaints were generated from senior management towards operations management. These complaints were expressed in phrases such as: “Why didn’t we do it sooner?” or “Why are we only addressing this now?” During the meetings, much of the time was spent explaining the processes at a tactical and operational level to senior management, revealing important gaps and opportunities for improvement.

  • Stage three: When choosing a technology for communication in the coordination of operations in manufacturing, it is important to take into account several key aspects. These include security, reliability, latency, and cost. These elements are fundamental to guaranteeing effective and efficient communication. In addition, it is also beneficial to consider the ability to integrate with other management and control systems in real time, which can optimize coordination and improve productivity in the manufacturing environment.

  • Stage four: The groups were defined based on the functional areas, as well as the objectives and goals established by management. In our case, the factor of geographical location or other types of organization other than the functional one, such as the matrix structure, were not taken into account. These aspects are relevant especially in large companies or with resources shared between different areas.

  • Stage five: During the configuration stage of the communication groups, various factors played a fundamental role in their formation. Among them are the complementarity of skills, the role and responsibilities of the participants, as well as information flows. Identifying the talents of each participant helps with the projection of the behavior of some elements in the group, allowing for the projection and configuration of more stable groups over time.

  • Stage six: Establishing goals, standards, metrics, and formalizing the delivery of resources is crucial to demonstrating management’s commitment to the improvement plan. Incorporating these agreements in employment contracts reinforces the importance of these aspects, even though there is no current specific legislation in this regard.

  • Stage seven: During the implementation of the PDCA cycles (plan, do, check, act), considerable increases in production levels and decreases in rejections were achieved, exceeding the goals established by management. The improvement plans were driven and diminished by a series of factors, which can be seen in Table 4 and Table 5.

To the extent that senior management better perceived and understood the events that occurred in the production process, they could project with a higher level of confidence the impact of the implementation of improvement options, authorizing resources more quickly.

As the model is put into action, two main products are generated: action plans and learning. A decrease in the number of situations that require coordination is also highlighted, as shown in Figure 8, Figure 9, Figure 10, Figure 11, Figure 12 and Figure 13, a product derived from learning is the faster reaction to a known situation, as well as faster coordination to new situations or situational patterns.
In Figure 13 we can see that there is no behavior that relates the number of situations and the work shift schedule. We can observe more frequently situations originating from the quality group, followed by the maintenance group, and with a lower frequency, the supervision group. Although one might expect a higher frequency at the beginning of the shift, this behavior was not observed. Additionally, although there are anomalous data points, they are not conclusive.
In Figure 14 we can see that there is a very low correlation between the time variable (schedule of the shift) and the number of situations in the three coordination groups.
Figure 14 shows a slight positive correlation (r: 0.17) between the number of situations in the maintenance group and the supervision group, which would allow us to say that these variables are weakly but positively related. The number of situations in the maintenance group and the quality group presented a positive correlation (r: 0.40), providing evidence that to the extent that there are more situations due to maintenance, there are more situations to coordinate in the quality group. Also, we detected a positive correlation (r: 0.30) between the number of situations between the quality and supervision group.
In Table 6 we can observe the frequency of the situational patterns per hour, this indicates that 71% of the hours studied a pattern (0 0 0) was presented, which indicates that there were 0 situations in the maintenance group, 0 in the quality group and 0 in the supervision group. The pattern (0 1 0) had a relative percentage frequency of 12%, being the second most frequent pattern, and the pattern (1 0 0) is the third most frequent pattern accounting for a 8% probability of occurrence, the other possible combinations together represent a 9% probability of occurrence.
In Table 7, it is noteworthy that the Quality group consistently exhibits the highest frequency, indicating greater involvement in managing situations compared to the other groups. Hours 1, 3, 6, and 8 emerge as moments with generally higher frequencies. In contrast, Hour 9 shows the lowest activity in terms of situations for all groups. Variability in frequencies is reflected in the standard deviation, with the Supervision group being the most variable. Furthermore, the coefficient of variation reveals that, although all groups show moderate levels of variability, the Supervision group has the highest relative variability. These results underscore the importance of considering the hourly distribution of situations and variability among groups, providing a comprehensive understanding of the dynamics of situations in this specific context.
  • Stage eight: the periodic meetings with management at the beginning were quite complex due mainly to the low situational awareness that management had of the events and scenarios faced by the operations management and the tactical and operational areas. But as the process progressed, their learning was a valuable catalyst for change, significantly improving the quality of decision making.

Our research has developed a sustainable operations management model designed for application in various companies. Unlike other models (see ref. [42]), our approach meticulously addresses the challenge of practical implementation, considering the different hierarchical levels of an organization, social interactions, information flows, new technologies, cultural aspects, and human responses adjusted proportionally, integrally, and derivatively. Additionally, we focus on knowledge development and the unique ability of humans to gain awareness of new situational patterns, reacting with limited and real-time information to emerging scenarios and situations.

5. Conclusions

In this study, a novel approach was devised, merging a qualitative model of situational awareness with the operational principles of a quantitative proportional, integral and derivative method.

We introduced innovation by establishing the concept of “levels of primary and secondary perception”, which can be managed based on the design of communication groups. Additionally, we defined cognitive work involving the visualization of a “common or special situational pattern” as a discrete event. This, in turn, facilitated comprehension, learning, and the generation of corrective and preventive action plans, which were created proportionally and integrally and applied to the process derivatively. This holistic approach considers the asymmetry that characterizes information flows in productive processes but strategically delivers a level of symmetry in communication within groups, thereby increasing levels of situational awareness in leadership, streamlining resource allocation, and consequently, improving the system’s responsiveness to deviations in process variables. The latter was achieved by designing an integrated communication system comprising operational, tactical, and strategic levels within a company.

The group situational awareness model proposed in this document and implemented in an industrial process obtained a success story by efficiently coordinating the information provided by both the external and internal environment to the process, generating a virtuous circle of information, which allowed for achieving a very relevant level of productivity improvement and reduction in the rejected (waste).

The action researcher methodology was perfectly adjusted to the situation under the study of participating directly with the teams, being mainly a facilitating agent and main source of theoretical knowledge applicable to process management.

The WhatsappMT tool efficiently met the required needs, despite being a generic and not very specific application, it managed to be useful in all the situations coordinated.

Real-time operations management is a challenge for directors and the entire operations team, but at the same time, it provides great benefits by more directly connecting the operation with the strategy.

The impact of our work aligns with several Sustainable Development Goals (SDGs). We contributed to SDG 8 (Decent Work and Economic Growth) by enhancing efficiency in production processes and to SDG 9 (Industry, Innovation, and Infrastructure) by introducing innovations in the management of these processes. Additionally, we addressed SDG 12 (Responsible Consumption and Production) by reducing the production of defective products and waste, and SDG 13 (Climate Action) by halting production in case of failures, promoting more sustainable practices. Our focus on collaboration between management and the Gemba supports SDG 17 (Partnerships for the Goals), consolidating a commitment to sustainable development.

This hypothesis finds support in the results obtained after implementing our model to an industrial process. The swift allocation of resources and timely halting of production in the face of failures have contributed to the sustainability of this process. The agility in decision making after establishing the communication system has shown to increase productivity through immediate actions, and the significant reduction in the production of defective products and waste confirms the effectiveness of these measures.